docs: phase 9 + phase 12 GUI closeout notes
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
This commit is contained in:
@@ -36,10 +36,10 @@
|
||||
| 6 | PAM module: `pam_authforge_pending.so` (C) | 3 days | ✅ **Code complete** (2026-04-27) — `pamtester` smoke recipe in `pam/TESTING.md` |
|
||||
| 7 | CLI: `authforgectl` | 4 days | ✅ **Done** (2026-04-27) — 14 subcommands |
|
||||
| 8 | GUI: app shell + Security Keys tab | 6–8 days | ✅ **Code complete** (2026-04-27) — 4 unit tests; manual smoke recipe in `gui/TESTING.md` |
|
||||
| 9 | GUI: Policy tab + lockout-warning UX | 4 days | **Spec'd** — open now (plan at [2026-04-27-phase-9-and-12-gui.md](2026-04-27-phase-9-and-12-gui.md); bundles Phase 12 GUI tab) |
|
||||
| 9 | GUI: Policy tab + lockout-warning UX | 4 days | ✅ **Code complete** (2026-04-27) — bundles Phase 12 GUI tab; 3 unit tests in `policy_form` |
|
||||
| 10 | First-login flow: autostart entry + fullscreen modal | 4 days | **Spec'd** — open now (Phase 6 ✓ + Phase 8 ✓) |
|
||||
| 11 | TOTP support (PAM module + GUI tab) — feature flag | 5 days | **Spec'd** — open now (Phase 2 ✓ + Phase 4 ✓ + Phase 8 ✓ for the GUI tab) |
|
||||
| 12 | Recovery flow (codes + emergency unlock) | 4 days | ✅ **Code complete** (2026-04-27) — backend + PAM landed; GUI tab folded into the Phase 9 lane plan |
|
||||
| 12 | Recovery flow (codes + emergency unlock) | 4 days | ✅ **Code complete** (2026-04-27) — backend + PAM + GUI tab all landed |
|
||||
| 13 | Debian packaging finalization (postinst, debconf, purge) | 4 days | **Spec'd** — sequential tail; needs all binaries built |
|
||||
| 14 | Launchpad PPA build setup | 2 days | **Spec'd** — sequential tail after 13; **VM smoke gate for all "Code complete" phases** |
|
||||
| 15 | `authforge-gnome-integration` (Users panel shortcut) | 3 days | ✅ **Done** (2026-04-27) — parallel subagent (gnome lane) |
|
||||
@@ -277,6 +277,29 @@ Backend + PAM landed via the plan at [2026-04-27-phase-12-recovery-backend.md](2
|
||||
- `pamtester` recovery walkthrough — recipe lives in `pam/TESTING.md` § Smoke test 4.
|
||||
- End-to-end recovery flow against a real PAM stack: admin issues code via CLI → user logs in entering it at the password prompt → recovery file deleted → pending(re_enroll=true) flag present → re-enrollment modal triggers on next login.
|
||||
|
||||
### Phase 9 + Phase 12 GUI closeout notes (2026-04-27)
|
||||
|
||||
Landed via the plan at [2026-04-27-phase-9-and-12-gui.md](2026-04-27-phase-9-and-12-gui.md). Built atop the Phase 8 GUI shell. Task 1 (AppContext refactor) was pre-landed by the prep lane (commit `a927d96`); the remaining 8 tasks ship as 8 commits on `feature/phase-9-and-12-gui`.
|
||||
|
||||
**Done in Phase 9:**
|
||||
- `gui/src/app_context.rs` — `AppContext` struct shared across pages (foreseen by Phase 8 Task 7; pre-landed by prep lane).
|
||||
- `gui/src/policy_form.rs` — pure mode-mapping + violation-grouping helpers. 3 unit tests.
|
||||
- `gui/src/policy_page.rs` — Policy tab with three master stacks (gdm-password / sudo / sshd) as `AdwComboRow`, inline `AdwBanner` for lockout simulation results, "Force apply" action, `AdwExpanderRow` for non-master stacks, live refresh via `PolicyChanged` subscription.
|
||||
|
||||
**Done in Phase 12 GUI:**
|
||||
- `gui/src/recovery_page.rs` — list / generate / revoke. One-shot copy dialog (`adw::AlertDialog`) for freshly issued codes; the daemon stores Argon2id hashes only, so plaintext is unrecoverable after the dialog closes.
|
||||
- `gui/src/bus.rs` extended with `get_policy`, `set_policy`, `generate_recovery_code`, `list_recovery_codes`, `revoke_recovery_code`, `subscribe_policy_changed`.
|
||||
|
||||
**Test count:** gui 4 → 7 (+3 from `policy_form`). Workspace total: 7 cli + 13 common + 60 daemon + 7 gui = **87 tests**.
|
||||
|
||||
**Plan deviations:**
|
||||
- `add_titled_with_icon` from the plan replaced with `add_titled` to match the existing `KeysPage` registration in `main.rs` (icons aren't surfaced by the current `ViewSwitcher`).
|
||||
- `policy_form.rs` carries a module-level `#![allow(dead_code)]` so the staged-but-not-yet-wired symbols pass the `-D warnings` gate at the Task 3 commit; consistent with the same pattern in `bus.rs` / `error.rs` from Phase 8.
|
||||
- `dialog.present(Some(&parent))` from the plan corrected to `dialog.present(&parent)` — `adw::Dialog::present` in libadwaita 0.6.0 takes `&impl IsA<Widget>` not `Option<…>`.
|
||||
|
||||
**Deferred until Phase 14 VM smoke:**
|
||||
- Manual Policy + Recovery walkthroughs in `gui/TESTING.md` against a real GNOME session with a Yubikey.
|
||||
|
||||
---
|
||||
|
||||
# Phase 0: Repository Scaffolding (FULLY DETAILED)
|
||||
|
||||