* Phase 9/10/11 status rows: dependencies satisfied, mark "open now" with
pointers to step-level plans where they exist.
* Phase 12 row: GUI tab is folded into the Phase 9 lane plan (not its own).
* ASCII dependency diagram: collapse the just-landed Phase-8/Phase-12-backend
layer; show the three open lanes (9+12-GUI, 11 TOTP, 10 first-login)
fanning into Phase 13.
* "Parallel-safe right now" heading bumped to post-Phase-8+12-backend.
Table swaps the now-stale Recovery and post-Phase-8 GUI rows for the
three actually-open lanes, with file footprints + plan links.
* Sequential tail paragraph names the six Code-complete phases (1, 3, 4,
6, 8, 12) whose deferred gates Phase 14 must clear.
* Phase 12 closeout intro names the merge commit and corrects the now-stale
"waiting on Phase 8" wording.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
Flips Phase 12 status to ✅ Code complete; bumps progress to 12/19 (63%).
Closeout block summarizes the 8 implementation tasks, lists all new
artifacts, calls out the 80-test count (was 60), and flags the Phase 14
deferred verifications (libargon2-dev compile + pamtester smoke).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
Cleans up scattered status markers into a single legend (Done / Code complete
/ Spec'd / Bundled), backfills v0.1.0-phase1 tag reference for Phase 1, marks
the table consistently for what's actually shipping vs. what needs the Phase
14 VM smoke. Updates the lane diagram to show what's done vs. in flight, and
adds a 'lessons learned from this session's parallelism' section capturing
when subagents-in-worktrees actually work and when they slip on sandbox-blocked
verification commands.
Adds closeout notes for Phases 3, 4+5, 6, 7, 15, 16 alongside the existing
Phase 1 and Phase 2 sections — what shipped, plan deviations, and any wire-
breaking signature changes (SetPolicy gained a force flag in Phase 4+5).
Captures which remaining phases are parallel-safe and which must stay
sequential. Four lanes (3 / 4+5 / 6 / 7) can land in any order right after
Phase 2 because they touch disjoint file trees: daemon/src/fido,
daemon/src/policy_apply + lockout, pam/*.c, and cli/src.
Documents practical caveats: Phase 4+5 must land together (shared SetPolicy
path), Phase 6 is the only C lane and needs libpam0g-dev, and the Phase 1
subagent-worktree cwd quirk should be retested before relying on it for
literal parallel-compute execution.
Renames the package and all artifacts to authforge to drop the
distro-specific prefix, since the roadmap targets Ubuntu + Debian +
KDE + eventually Fedora (option C in the design).
- deb packages: authforge, authforge-{daemon,pam,cli,gui,gnome-integration}
- binaries: authforged, authforgectl, authforge (GUI)
- D-Bus name: io.dangerousthings.AuthForge
- PAM module: pam_authforge_pending.so
- Paths: /etc/authforge/, /var/lib/authforge/, /usr/share/pam-configs/authforge
- PPA: ppa:dangerousthings/authforge
Filesystem path /home/work/VSCodeProjects/ubuntu_fido/ left as-is for
historical reference; can rename later via git mv at the dir level.
Verified: cargo build/test/clippy/fmt clean, pam builds, gui builds,
all 5 debs produced.