* Phase 9/10/11 status rows: dependencies satisfied, mark "open now" with
pointers to step-level plans where they exist.
* Phase 12 row: GUI tab is folded into the Phase 9 lane plan (not its own).
* ASCII dependency diagram: collapse the just-landed Phase-8/Phase-12-backend
layer; show the three open lanes (9+12-GUI, 11 TOTP, 10 first-login)
fanning into Phase 13.
* "Parallel-safe right now" heading bumped to post-Phase-8+12-backend.
Table swaps the now-stale Recovery and post-Phase-8 GUI rows for the
three actually-open lanes, with file footprints + plan links.
* Sequential tail paragraph names the six Code-complete phases (1, 3, 4,
6, 8, 12) whose deferred gates Phase 14 must clear.
* Phase 12 closeout intro names the merge commit and corrects the now-stale
"waiting on Phase 8" wording.
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>