michael 576eeca401 docs(applet): finalize INSTALL.md M2 acceptance — pin verdict log + UID (M2H.1 final)
Updates the --step-up expected-output block to the actual STEP-UP M2 OK
line emitted on 2026-06-12 verdict, and pins the verified card UID +
log path. Memory step_up_implementation_notes.md filled in the 3 TODO
markers (M2E + M2F + M2G.2 verdict) and added a J3R452 transient pool
budget table (~2,835 / 3,120 B used post-M2G.2).
2026-06-17 18:06:58 -07:00
Description
java card applet(s) for Aliro
42 MiB
Languages
C 89.7%
HTML 3.5%
Assembly 3.1%
CSS 2.1%
Java 0.7%
Other 0.9%