michael 91731150d5 docs: phase 12 backend closeout notes
Flips Phase 12 status to  Code complete; bumps progress to 12/19 (63%).
Closeout block summarizes the 8 implementation tasks, lists all new
artifacts, calls out the 80-test count (was 60), and flags the Phase 14
deferred verifications (libargon2-dev compile + pamtester smoke).

Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>
2026-04-27 09:53:09 -07:00

authforge

Turnkey U2F / FIDO2 passkey / TOTP MFA for Linux desktops. v1 ships on Ubuntu LTS + GNOME; Debian and KDE Plasma are on the roadmap.

Install (end users)

sudo add-apt-repository ppa:dangerousthings/authforge
sudo apt install authforge

Build from source

See docs/BUILDING.md.

Status

Pre-alpha. Phases 07, 15, 16 code complete (workspace scaffold, D-Bus daemon, storage layer, FIDO2 backend, policy apply via pam-auth-update with lockout simulation, PAM pending-flag backstop, authforgectl CLI, gnome-control-center overlay, Ansible role for fleet deployment). Phase 8 (GUI Security Keys tab) and Phase 12 (recovery flow) are the next single-lane bundles. See docs/plans/ for design, roadmap, and per-phase implementation plans.

Copyright 2026 Dangerous Things, LLC. Licensed under the Apache License, Version 2.0.

Description
mfa support and related user management and policy tools for linux
Readme 398 KiB
Languages
Rust 95.9%
C 3.6%
Jinja 0.3%
Makefile 0.2%